About
Partex Advantages
ParTex Design Build Contractors Inc. has served the larger GTA since 1981.
We will take care of 100% of all your needs.
A few of our design mantras:
Master planning; Lets plan for your needs now and five years from now. You may have the need to plan the work over multiple phases.
We encourage maintenance-free design, materials and finishes
Protection of existing finishes and landscaping to remain
Quality construction and materials throughout the entire project. We do not use sub standard materials or materials like OSB (oriented strand board) that will lead to future problems.
Generally, we have no call backs to address deficiencies. We do our best to do everything the right way the first time.
There are many advantages to dealing with Partex over other design/builders, the most important is our dedication to working with you to establish a budget that will meet your needs, design to that budget and build to that same budget. You will know exactly what your project will cost, right at the beginning of the process and before your permit is applied for and long before we begin construction.
1. We provide all of the expertise you will require for your project .
Master planning, initial concept and budget
Architectural design
Structural Engineering
HVAC engineering
Committee of Adjustment for zoning issues, if any
Building permits
All of your construction needs, including landscaping
Interior design, colors, kitchen design, lighting design
You only will be dealing with one point of contact throughout, myself, Andrew Parker
With only one contact, there will be continuity of thought and design throughout the entire project
We will be familiar with your tastes and preferences in all matters.
2. Transparency and cost controls
ParTex utilizes an Excel spreadsheet (see attached) from day 1 to track projected and actual costs throughout your entire project lifespan, and share it with our clients on a regular basis.
Please refer to the attached spreadsheet. All major items are included and shown. Most clients will have a larger wish list than they wish to pay for. This is a normal part of the process for everyone, including ourselves when my wife and I renovated our home two years ago. Utilizing transparency and our spreadsheet you will be fully informed of all of the projected costs before committing to one particular design. This means you, as the client, retain complete control of the extent of the design and cost of the entire project, right down to the hardware and finishes. Once a realistic budget has been set, it is now our job to design a project to your taste and build it to budget. These are the main reasons we enjoy a five star rating for client satisfaction and are ranked amongst the very best GTA builders.
3. Experience
Andrew Parker and ParTex Design Build have over 38 years of experience with additions, major renovations and commercial interiors in the larger GTA. We have managed projects in excess of $3.75 million dollars, most of which were of very high caliber for exacting clients. Besides residential, we have managed many other projects; hospitals, universities, restaurants, bars, hotels, museums, exhibits and displays, movie sets, airport lounges and more. Andrew Parker is a master carpenter and a third generation Ontario builder. Please see attached for a notice from 1964, announcing Andrew’s father, Tom Parker, joining his grandfather’s firm of Par-Tex Engineering and Contracting Company Ltd. Par-Tex was founded by Andrew’s grandfather in 1928. This is the business he grew up in before forming his own in 1981. Andrew learned his trade as a master carpenter and renovator working with top notch firms such as Glover Walmer, Walder and McSweeney, Kellner-Jordan and Sorenson Custom Homes.We look forward to working with you.
Please call or write to arrange a Zoom or telephone call so we may discuss your project in more detail.
All the best,
Andrew Parker
Partex Design Build Contractors Inc. “Since 1981”
(416) 504-9455 WWW.PARTEX.CA
Environmental mission and strategy (ESG)
We believe that most waste, pollution and carbon footprint occurs during poor planning of most projects. "Tear it down and build new" ?
Not the modern way. RE-USE, REDUCE, RECYCLE
Use as much of the existing as practical (in this meaning, practical is directly the result of the skills of the designers and builders) This reduces development fees, overall costs, carbon footprint, overall schedule, to name a few benifits.
Work with us, and you will see more benifit every day.
"Since 1981"