Slab on Grade
Slab-on-grade technical guide
...to pour a footing, again to pour walls, and a third time to pour a basement floor. For every ton of concrete produced, one ton of greenhouse gases is released into the atmosphere.
Once a basement foundation is completed, a subfloor must be built on top. This is another cost that will be incurred in order to create a su...