The complex foundation and undulating rock surface required extensive customization of the Quad-Lock panels, which included numerous changes in wall thickness and different support mechanisms for the panels on either side of the same wall. The ability to hand carve each Quad-Lock panel was crucial to the success of this project.
The multiple elevation changes and customized footings and pads created a series of challenging steel reinforcement and forming details. Drops in footing levels, as much as six feet, had created virtual “windows” in the foundation which generated another set of challenges during concrete placement.